Terafab Project
Sector: Advanced Electronics • Location: United States
Source: Phemex
Tesla's $25 billion vertically integrated semiconductor fabrication facility to produce 100-200 billion custom AI chips per year at the 2-nanometer node. It targets Tesla's Full Self-Driving, Dojo supercomputer, and Optimus humanoid robot programs. The project aims to start operations on March 21, 2026, with ambitions to scale production capacity significantly.
- Status
- Prospective
- Sector
- Advanced Electronics, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Phemex
ConstructChat
Ask ConstructChat about Terafab Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tesla's $25 billion vertically integrated semiconductor fabrication facility to produce 100-200 billion custom AI chips per year at the 2-nanometer node. It targets Tesla's Full Self-Driving, Dojo supercomputer, and Optimus humanoid robot programs. The project aims to start operations on March 21, 2026, with ambitions to scale production capacity significantly. |
Original sector | Technology |
Budget |
Location
Country | United States of America (USA) |
Source
Source | Phemex |
URL |
More Details
Record type | Project |
Sector | Advanced Electronics, Manufacturing (Industrial) |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
