logo

TeraWulf AI Data Center Project

Sector: Data Center • Location: Lansing, New York, United States

Source: The Ithaca Voice

Project
Planned

TeraWulf, a Maryland-based digital infrastructure company, proposed to build an AI data center at the site of a former coal power plant in the Town of Lansing. The project aims to redevelop a defunct industrial site, stimulate tax growth, and create jobs, primarily temporary construction positions. The project was initially not in compliance with the town's zoning ordinance, but after filing appea

Status
Prospective
Sector
Data Center, Manufacturing (Industrial), Power Generation (CCGT)
Location
Lansing, New York, United States of America
Updated
22 Jul 2026
Source
The Ithaca Voice

ConstructChat

Ask ConstructChat about TeraWulf AI Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “TeraWulf AI Data Center Project” is an infrastructure initiative in the Data Center sector, located in Lansing, New York, United States. Taiyo aggregates data on it from The Ithaca Voice.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

TeraWulf, a Maryland-based digital infrastructure company, proposed to build an AI data center at the site of a former coal power plant in the Town of Lansing. The project aims to redevelop a defunct industrial site, stimulate tax growth, and create jobs, primarily temporary construction positions. The project was initially not in compliance with the town's zoning ordinance, but after filing appeals, the zoning board approved its classification as a general processing facility, allowing it to proceed to the next stage of the planning process.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

New York

City

Lansing

Source

Source

The Ithaca Voice

URL

More Details

Record type

Project

Sector

Data Center, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-12-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project