logo
ProjectClosed

Terminal 18 Shore Power Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The T-18 (Terminal 18) Shore Power Project will install shore power at Berths 1 and 3 of T18. The scope of this project includes installing a new electrical feeder from Seattle City Light substation N1 to Berth 1. A new feeder will also be installed from Seattle City Light substation N2 to Berth 3. To install the new feeders, new conduit will need to be installed by means of trenching and horizont

Status
Closed
Sector
Government, Power Generation (CCGT), Power Transmission, Commercial
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Terminal 18 Shore Power Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Terminal 18 Shore Power Improvements” is an infrastructure initiative in the Government sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The T-18 (Terminal 18) Shore Power Project will install shore power at Berths 1 and 3 of T18. The scope of this project includes installing a new electrical feeder from Seattle City Light substation N1 to Berth 1. A new feeder will also be installed from Seattle City Light substation N2 to Berth 3. To install the new feeders, new conduit will need to be installed by means of trenching and horizontal directional drilling. New shore power substations will be installed at Berths 1 and 3. From th...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT), Power Transmission, Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project