Terminal 2, Sir Seewoosagur Ramgoolam International Airport

Sector: Aerospace & Defense • Location: Mauritius

Source: World Bank Group

Project
Active

Aéroports de Paris Management (ADPM) was selected by the government of Mauritius to finance, build, and manage Terminal 2 of the Sir Seewoosagur Ramgoolam international airport. The terminal was to have a capacity of 4 million passengers (up to 1,640 passengers per hour at peak times), 57,000 square meters of new surface area, 8 contact stands, 52 check-in desks, 6 baggage claim carrousels, and 9

Project Information FAQ

Project Information

5 Q
The project “Terminal 2, Sir Seewoosagur Ramgoolam International Airport” is an infrastructure initiative in the Aerospace & Defense sector, located in Mauritius. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Aéroports de Paris Management (ADPM) was selected by the government of Mauritius to finance, build, and manage Terminal 2 of the Sir Seewoosagur Ramgoolam international airport. The terminal was to have a capacity of 4 million passengers (up to 1,640 passengers per hour at peak times), 57,000 square meters of new surface area, 8 contact stands, 52 check-in desks, 6 baggage claim carrousels, and 9 telescopic air bridges. ADPM was selected to finance, build, and manage the new terminal, jointly with the Mauritian public company AML (Airport of Mauritius Ltd.) ADPM also signed a technical assistance contract to ensure implementation of the new terminal project. It also signed a management contract for three years after the opening of the terminal. Aéroports de Paris Engineering (ADPI) signed at two-year supervision contract for the construction of the new terminal and associated infrastructure. They were chosen to carry out the design and engineering of the terminal and surrounding area. The terminal cost $383 million to construct (Rs 11 billion). Around 85% of the the project was financed by a loan from the EXIM Bank of China to the Mauritius Port Authority. Construction commenced on March 30, 2011, and was expected to be completed by December 2012. By November 2011, 41% of the project had been completed. Works on the passenger terminal were 90% complete. The overall apron construction was 60% complete. As of November 2011, Terminal 2 was expected to be operational in 2013. PPP update.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data