Terminal Enhancement Project
One of 10,000+ projects Taiyo tracks in Michigan.
Source: Dodge USA
The Terminal Enhancement Project Phase 1 consists of a 2-story westward expansion of the main terminal to include a centralized in-line Checked Baggage Inspection System (CBIS) system with Checked Baggage Resolution Area (CBRA), baggage makeup area, relocated ticket counters, terminal roadway and curb front improvements and associated facilities to house a CBIS system which will replace stand-alon
- Status
- Closed
- Sector
- Steel, Residential, Airport, Government, Manufacturing (Industrial), Commercial
- Location
- Grand Rapids, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Terminal Enhancement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Terminal Enhancement Project Phase 1 consists of a 2-story westward expansion of the main terminal to include a centralized in-line Checked Baggage Inspection System (CBIS) system with Checked Baggage Resolution Area (CBRA), baggage makeup area, relocated ticket counters, terminal roadway and curb front improvements and associated facilities to house a CBIS system which will replace stand-alone baggage screening pods located within the current Airline Ticket Office space of the Gerald R. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Grand Rapids |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Residential, Airport, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
