Terminal Expansion at Myrtle Beach International Airport
The status, timeline and source of this project. A free account opens every field.
Source: Simple Flying
Myrtle Beach International Airport completed a renovation and expansion of its main terminal building in December 2025. The project added six gates, increasing from 12 to 18 gates, with higher ceilings, larger windows, more walking space, larger restrooms, new retail spaces, countertop charging tables, an improved wayfinding system, and a new advanced baggage handling system.
- Status
- Closed
- Sector
- Airport, Commercial
- Location
- Myrtle Beach, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Simple Flying
ConstructChat
Ask ConstructChat about Terminal Expansion at Myrtle Beach International Airport
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Myrtle Beach International Airport completed a renovation and expansion of its main terminal building in December 2025. The project added six gates, increasing from 12 to 18 gates, with higher ceilings, larger windows, more walking space, larger restrooms, new retail spaces, countertop charging tables, an improved wayfinding system, and a new advanced baggage handling system. |
Original sector | Airports |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Myrtle Beach |
Source
Source | Simple Flying |
URL |
More Details
Record type | Project |
Sector | Airport, Commercial |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
