Terminal Improvements
Sector: Power Generation (CCGT) • Location: Rochester, New York, United States of America
Source: Dodge USA
This project involves the construction of new walls, corridors, entrance vestibules, and circulation for pedestrians. Building renovations include mechanical equipment, electrical, fire protection, and HVAC system upgrades to support both improved circulation and provide additional leased space for airline and / or tenant usage. It is also anticipated that the expansion of services with low-fare a
- Status
- Prospective
- Sector
- Power Generation (CCGT), Airport, Government, Manufacturing (Industrial), Commercial
- Location
- Rochester, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Terminal Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project involves the construction of new walls, corridors, entrance vestibules, and circulation for pedestrians. Building renovations include mechanical equipment, electrical, fire protection, and HVAC system upgrades to support both improved circulation and provide additional leased space for airline and / or tenant usage. It is also anticipated that the expansion of services with low-fare and regional carriers will require the renovation of the concourse function to provide the require... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Rochester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Airport, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
