Terminal Operations Area Redevelopment
One of 10,000+ projects Taiyo tracks in Quebec.
Source: Dodge USA
The works of this project includes the leveling of the paving and the removal of granular materials in place, up to required leveling level, the reinstallation of a pavement structure, as well as the installation of place of a peripheral drainage ditch, as shown on the plans. All related details are found in the solicitation.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Commercial
- Location
- Cap-Aux-Meules, Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Terminal Operations Area Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The works of this project includes the leveling of the paving and the removal of granular materials in place, up to required leveling level, the reinstallation of a pavement structure, as well as the installation of place of a peripheral drainage ditch, as shown on the plans. All related details are found in the solicitation. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Quebec |
City | Cap-Aux-Meules |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
