Terminal Tunnel Membrane Project
Sector: Road • Location: Cleveland, Ohio, United States
Source: Spectrum News
The Terminal Tunnel Membrane Project at Cleveland Hopkins International Airport aims to waterproof and rehabilitate the pedestrian connecting tunnel on the RTA Level. The project will involve structural and concrete wall repairs, as well as electrical work, and is expected to take eight months with lane closures on the lower roadway.
- Status
- Under Construction
- Sector
- Road, Tunnel, Cement, Airport
- Location
- Cleveland, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Spectrum News
ConstructChat
Ask ConstructChat about Terminal Tunnel Membrane Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Terminal Tunnel Membrane Project at Cleveland Hopkins International Airport aims to waterproof and rehabilitate the pedestrian connecting tunnel on the RTA Level. The project will involve structural and concrete wall repairs, as well as electrical work, and is expected to take eight months with lane closures on the lower roadway. |
Location
Country | United States of America (USA) |
State | Ohio |
City | Cleveland |
Source
Source | Spectrum News |
URL |
More Details
Record type | Project |
Sector | Road, Tunnel, Cement, Airport |
Article published date | 2025-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
