logo
ProjectCompleted

Termoflores

Sector: Waste Processing and Treatment • Location: Colombia

Source: International Finance Corporation (IFC)

The project consists of the construction of a 169 MW natural gas-fired combined cycle unit by Termoflores S.A. E.S.P. (“Termoflores” or “the Company”), a generation company whose operations are located in Barranquilla, Colombia. Currently, Termoflores has three natural gas-fired units in operation, (the Flores I combined-cycle and the Flores II and III open-cycle) with a total installed capacity o

Status
Closed
Sector
Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Geothermal, Natural Gas, Government, Manufacturing (Industrial), Power Generation (CCGT)
Location
Colombia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Termoflores

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Termoflores” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Colombia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the construction of a 169 MW natural gas-fired combined cycle unit by Termoflores S.A. E.S.P. (“Termoflores” or “the Company”), a generation company whose operations are located in Barranquilla, Colombia. Currently, Termoflores has three natural gas-fired units in operation, (the Flores I combined-cycle and the Flores II and III open-cycle) with a total installed capacity of 441 MW. Flores IV includes the expansion/conversion of the existing gas turbines in Flores II and III from open cycle to a combined cycle facility, by adding a new steam turbine generator, heat recovery steam generator and balance of plant equipment. Flores IV will utilize the waste heat from Flores II and III to provide 169 MW of additional capacity without using significant additional gas. After the Project is completed, Termoflores will have two operating units (Flores I and Flores IV) with a generation capacity of 610 MW. The estimated construction time is 25 months and project completion must be attained before December 1, 2010.The cost of the project is estimated at $278.2 million. The project will be financed with $55.6 million of equity (from cash from operations) and $222.6 million of debt. The debt component includes: - IFC A/B facility of $200 million, and- local currency loan of $22.6 million equivalent. In addition to the reliability charge, the company expects to generate revenues from CO2 emission reductions of about $4 million per year, based on CO2 emission reductions approximately 460,000 MT per year.

Original sector

AB - Gas - Thermal Power Generation

Location

Country

Colombia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Geothermal, Natural Gas, Government, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project