Termoflores
Sector: Waste Processing and Treatment • Location: Colombia
Source: International Finance Corporation (IFC)
The project consists of the construction of a 169 MW natural gas-fired combined cycle unit by Termoflores S.A. E.S.P. (“Termoflores” or “the Company”), a generation company whose operations are located in Barranquilla, Colombia. Currently, Termoflores has three natural gas-fired units in operation, (the Flores I combined-cycle and the Flores II and III open-cycle) with a total installed capacity o
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Geothermal, Natural Gas, Government, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Termoflores
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the construction of a 169 MW natural gas-fired combined cycle unit by Termoflores S.A. E.S.P. (“Termoflores” or “the Company”), a generation company whose operations are located in Barranquilla, Colombia. Currently, Termoflores has three natural gas-fired units in operation, (the Flores I combined-cycle and the Flores II and III open-cycle) with a total installed capacity of 441 MW. Flores IV includes the expansion/conversion of the existing gas turbines in Flores II and III from open cycle to a combined cycle facility, by adding a new steam turbine generator, heat recovery steam generator and balance of plant equipment. Flores IV will utilize the waste heat from Flores II and III to provide 169 MW of additional capacity without using significant additional gas. After the Project is completed, Termoflores will have two operating units (Flores I and Flores IV) with a generation capacity of 610 MW. The estimated construction time is 25 months and project completion must be attained before December 1, 2010.The cost of the project is estimated at $278.2 million. The project will be financed with $55.6 million of equity (from cash from operations) and $222.6 million of debt. The debt component includes: - IFC A/B facility of $200 million, and- local currency loan of $22.6 million equivalent. In addition to the reliability charge, the company expects to generate revenues from CO2 emission reductions of about $4 million per year, based on CO2 emission reductions approximately 460,000 MT per year. |
Original sector | AB - Gas - Thermal Power Generation |
Location
Country | Colombia |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Geothermal, Natural Gas, Government, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Colombia
- Bello Wastewater Treatment Plant
- Rio Bogota Wastewater Treatment Project
- Aguas de la Guajira
- Barranquilla Sewerage Treatment Plant
- Centroaguas
- Suroeste Antioqueno water utilities
- AASSA operation of eight water utility municipalities in Antoquia
- San Pedro de los Milagros, Santa Rosa de Osos, Titiribi, and Venecia municipalities water utility
