Termoguayas Floating Power Plant
Sector: Geothermal • Location: Ecuador
Source: World Bank Group
On June 29, 2005, Ecuador’s federal power regulator Conelec awarded a 15 year contract to Termoguayas Generation SA (TGSA) to build and operate competitively a 150 MW thermal generation plant for Esclusas, the southern section of Guayaquil. The project was slated to increase the security of Ecuador’s power supply. It was part of the larger La Josefina electric power complex which included power ba
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | On June 29, 2005, Ecuador’s federal power regulator Conelec awarded a 15 year contract to Termoguayas Generation SA (TGSA) to build and operate competitively a 150 MW thermal generation plant for Esclusas, the southern section of Guayaquil. The project was slated to increase the security of Ecuador’s power supply. It was part of the larger La Josefina electric power complex which included power barges owned by Intervisa Trade and Ulysseas. Termoguayas Generation SA was a wholly owned subsidiary of Keppel Energy Pte Ltd, a Singapore energy company. The project reached financial closure on January 20, 2006 when TGSA signed the contract with Conelec. Power generation was to be provided by plants on barges that were redeployed from Brazil. TGSA possessed the assets at the time of contract signing and committed US $15 million to become operational and build transmission lines connecting to the national grid. TGSA was to gain revenue from competitive sales on the national grid as well as contractual payments by Conelec for generation capacity. Based on MIGA's insurance the estimated project cost was US$103 million. On December 1, 2006 the power barges became operational and began supplying power to the national grid. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
