Termonorte is a joint-venture of El Paso International (40%) and C&S Participacoes (60%). The Termonorte Project is divided into two phases. Phase I involves the construction of a diesel-fired power plant with a capacity of 64 MW and construction cost of US$ 60 million. A 10-year power purchase agreement was signed between Termonorte and Electronorte for the power generated by this unit (January 2
- Status
- Prospective
- Sector
- Natural Gas, Power Generation (CCGT), Commercial, Government
- Location
- Rondonia, Brazil
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Termonorte Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Termonorte is a joint-venture of El Paso International (40%) and C&S Participacoes (60%). The Termonorte Project is divided into two phases. Phase I involves the construction of a diesel-fired power plant with a capacity of 64 MW and construction cost of US$ 60 million. A 10-year power purchase agreement was signed between Termonorte and Electronorte for the power generated by this unit (January 2000). The second phase involves a natural-gas combined cycle power plant with capacity of 345 MW and construction costs of US$ 220 million. Eletronorte has also signed a power purchase agreement for this second phase (May 2000). The construction works on the first phase started in January 2000 and were concluded in July 2000. Works on the second phase (Termonorte II) were conclude in mid-2003. El Paso Corporation principally conducted their Brazilian development activities within an investment arm called Gemstone. El Paso Corp. owned approximately 50% of Gemstone, which, in turn, owned 50% of Porto Velho (Termonorte Project). Gemstone Investors, an unrelated party capitalized by private equity (Rabobank International) and debt, owned the remaining 50 percent of Gemstone. In March 2009, Termogas S.A., a company owned by CS Participacoes (75%) and Termopar (25%), acquired 70% of Termonorte. The remaining shares were acquired PB Participacoes (30%). Sponsor name needs to be changed |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Rondonia |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Power Generation (CCGT), Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Natural Gas projects in Brazil
- Marlim Azul GasFired Power Plant Rio de Janeiro Brazil
- GNA II LNG Power Plant Rio de Janeiro Brazil
- Lagoa do Barro Wind Complex Piaui
- Porto de Sergipe I Power Project Barra dos Coqueiros
- Gas Brasiliano Distribuidora SA
- Macae Power Plant
- Port of Acu I LNG-to-Power plant
- Maranhao III Thermal Power Plant (Parnaiba II)