The investment programme is part of the promoter's investment plan to expand and reinforce the electricity transmission network in Italy. It concerns the expansion of the 150 kV network to the island of Capri, which is at present an isolated system, and the Sorrento peninsula, to replace the existing 60 kV electricity network. The investment programme focuses on the construction of new assets: 150
- Status
- Under Construction
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Italy
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about TERNA CAPRI-CONTINENTE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The investment programme is part of the promoter's investment plan to expand and reinforce the electricity transmission network in Italy. It concerns the expansion of the 150 kV network to the island of Capri, which is at present an isolated system, and the Sorrento peninsula, to replace the existing 60 kV electricity network. The investment programme focuses on the construction of new assets: 150 kV subsea cables (46 km), 150 kV overhead lines (20.2 km), 150 kV underground cables (13.7 km), 6 kV underground cable (0.75 km) and two high-voltage to medium-voltage substations (160 MVA of new capacity). The investment programme also includes the upgrade of 21.2 km of 220 kV overhead lines. |
Original sector | Energy |
Location
Country | Italy |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project