Terra Santa wind farm
Active · Rio Grande Do Norte
Source: World Bank Group
The project involves the construction of the Terra Santa wind farm with capacity of 92.3MW, located in the Brazilian state of Rio Grande do Norte. Sponsors are Total Eren and Vila Energia Renovavel.
The BRL 490 million ($91.99 million) debt package included a $45.26 million loan from Banco do Norderste do Brazil; a $18.69 million bridge loan from Santander and Banco do Brasil and a $28.03 million
- Status
- Prospective
- Sector
- Cable car, Wind, Power Generation (CCGT), Raw Materials, Bridge, Automotive, Commercial, Telecommunications, Government
- Location
- Rio Grande Do Norte, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Terra Santa wind farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of the Terra Santa wind farm with capacity of 92.3MW, located in the Brazilian state of Rio Grande do Norte. Sponsors are Total Eren and Vila Energia Renovavel. The BRL 490 million ($91.99 million) debt package included a $45.26 million loan from Banco do Norderste do Brazil; a $18.69 million bridge loan from Santander and Banco do Brasil and a $28.03 million green bond facility arranged by Santander, SMBC and Banco do Brasil. The BOO project holds 20-year PPA and is expected to commence operations mid-2021. Financial close was reached on 26 November 2020. https://ijglobal.com/data/transaction/51437 https://www.total-eren.com/wp-content/uploads/2020/11/PR-Total-Eren-FC-Terra-Santa-Maral_EN_FINAL.pdf |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Rio Grande Do Norte |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Cable car, Wind, Power Generation (CCGT), Raw Materials, Bridge, Automotive, Commercial, Telecommunications, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
