Terry Replacement Dock
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Replace existing dock with new dock in the same footprint. A 6 x13 pier walkway will be constructed of welded steel tubing supported by (2) 8 diameter untreated steel piles. A 3 x14 aluminum ramp will connect the pier to an 8 x30 float. The float will be supported by 3 untreated steel piles. All decking surfaces will be light-penetrating. A new 10 x12 boat lift is also proposed.
- Status
- Prospective
- Sector
- Commercial, Metal, Steel, Manufacturing (Industrial)
- Location
- Bellingham, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Terry Replacement Dock
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace existing dock with new dock in the same footprint. A 6 x13 pier walkway will be constructed of welded steel tubing supported by (2) 8 diameter untreated steel piles. A 3 x14 aluminum ramp will connect the pier to an 8 x30 float. The float will be supported by 3 untreated steel piles. All decking surfaces will be light-penetrating. A new 10 x12 boat lift is also proposed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bellingham |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Steel, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
