Tesla Collision Center
Bid results · Nevada · Last reported Dec 2024
Source: Dodge USA
Official invite to ground up Tesla Collision Center located in Las Vegas, NV. Paint Booth - F&I by Tesla BUT GC/SUB to handle concrete pits, and coordinate POCs for MEPs, FP, LV. . *HVAC also to provide alternate manufactures for mech. equipment outside what is shown on plans. *Panelized Wood Structure - Provide alternate in lieu of per
- Status
- Closed
- Sector
- Metal, Cement, Automotive, Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tesla Collision Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Official invite to ground up Tesla Collision Center located in Las Vegas, NV. Paint Booth - F&I by Tesla BUT GC/SUB to handle concrete pits, and coordinate POCs for MEPs, FP, LV. *HVAC to alternate solution and pricing to cool paint booths*. *HVAC also to provide alternate manufactures for mech. equipment outside what is shown on plans. *Panelized Wood Structure - Provide alternate in lieu of per plan Metal Deck/Joist*. Dry Utilities - provide allowance for +/- 80' of conduit boring and/or tr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Automotive, Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
