Tesla Energy Storage Expansion
Sector: Energy Storage • Location: Lathrop, Houston, California, Texas, United States
Source: Techi
Tesla Energy deployed 46.7 GWh of battery storage in 2025, a 49% year-on-year increase, generating $12.77 billion in revenue with 29.8% gross margins. Tesla plans to expand storage capacity with Megapack 3 and a 20 MWh Megablock, with a $20 billion capex guide aimed at storage capacity expansion including new facilities in Lathrop, Shanghai, and Houston.
- Status
- Under Construction
- Sector
- Energy Storage
- Location
- Lathrop, Houston, California, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Techi
ConstructChat
Ask ConstructChat about Tesla Energy Storage Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tesla Energy deployed 46.7 GWh of battery storage in 2025, a 49% year-on-year increase, generating $12.77 billion in revenue with 29.8% gross margins. Tesla plans to expand storage capacity with Megapack 3 and a 20 MWh Megablock, with a $20 billion capex guide aimed at storage capacity expansion including new facilities in Lathrop, Shanghai, and Houston. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | California, Texas |
City | Lathrop, Houston |
Source
Source | Techi |
URL |
More Details
Record type | Project |
Sector | Energy Storage |
Article published date | 2026-04-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States
- Tampa Bay Seawater Desalination Plant
- Centrally Managed Pay-and-Display Parking
- Chevron Richmond Refinery
- Nestle Food and Distribution Centre, USA
- Pepperidge Farm Bakery Plant
- Baldock Solar Highway
- Doyle Drive Replacement / Presidio Parkway, San Francisco, US
- Newtown Creek (35-G) North and North Central Batteries
