logo

Tesla US Solar Panel Manufacturing Facility in Brookshire, Texas

Sector: Energy Storage • Location: Brookshire, Texas, United States

Source: Interesting Engineering

Project
Under Construction

Tesla has started solar panel manufacturing operations at its facility in Brookshire, Texas, near Houston. The new factory is co-located with its Megapack Megafactory at the Empire West Business Park. Tesla plans to build 100 GW per year of U.S. solar manufacturing capacity by 2028, aiming to create a fully integrated energy ecosystem combining solar manufacturing with large-scale battery producti

Status
Under Construction
Sector
Energy Storage, Solar, Manufacturing (Industrial)
Location
Brookshire, Texas, United States of America
Updated
22 Jul 2026
Source
Interesting Engineering

ConstructChat

Ask ConstructChat about Tesla US Solar Panel Manufacturing Facility in Brookshire, Texas

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Tesla US Solar Panel Manufacturing Facility in Brookshire, Texas” is an infrastructure initiative in the Energy Storage sector, located in Brookshire, Texas, United States. Taiyo aggregates data on it from Interesting Engineering.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tesla has started solar panel manufacturing operations at its facility in Brookshire, Texas, near Houston. The new factory is co-located with its Megapack Megafactory at the Empire West Business Park. Tesla plans to build 100 GW per year of U.S. solar manufacturing capacity by 2028, aiming to create a fully integrated energy ecosystem combining solar manufacturing with large-scale battery production.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

City

Brookshire

Source

Source

Interesting Engineering

URL

More Details

Record type

Project

Sector

Energy Storage, Solar, Manufacturing (Industrial)

Article published date

2026-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project