Test-Well Drilling
Sector: Water Supply and Storage • Location: Fairfax, Vermont, United States of America
Source: Dodge USA
At two locations at the site (approximately 500 feet apart), the well contractor will utilize a dual-rotary drill rig to advance temporary 6-inch diameter steel casing, and use a diverter to control the discharge of air, water, and cuttings. Sediment samples will be collected by Town s hydrogeologist. If a promising layer of water-bearing sand and gravel is encountered, a 5-foot length of stainles
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Residential, Steel, Government, Metal, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Fairfax, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Test-Well Drilling
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | At two locations at the site (approximately 500 feet apart), the well contractor will utilize a dual-rotary drill rig to advance temporary 6-inch diameter steel casing, and use a diverter to control the discharge of air, water, and cuttings. Sediment samples will be collected by Town s hydrogeologist. If a promising layer of water-bearing sand and gravel is encountered, a 5-foot length of stainless-steel wire-wrap telescoping well screen (40 to 60 slot) and k-packer will be lowered to the zon... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Fairfax |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Residential, Steel, Government, Metal, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
