logo

Testing on new section of Spanish high-speed railway

Sector: Advanced Electronics • Location: Madrid, Spain

Source: RailTech

Project
Ongoing

Adif will kickoff a testing programme on the new section of the high-speed railway line between the Chamartín-Clara Campoamor station in Madrid and the railway fork in the Torrejón de Velasco municipality south of the capital. The tests will last until the end of the coming week and will see three Renfe-operated Talgo-Bombardier S112 trains simulate a regular passenger service. The new double-trac

Project Information FAQ

Project Information

3 Q
The project “Testing on new section of Spanish high-speed railway” is an infrastructure initiative in the Advanced Electronics sector, located in Madrid, Spain. Taiyo aggregates data on it from RailTech.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Adif will kickoff a testing programme on the new section of the high-speed railway line between the Chamartín-Clara Campoamor station in Madrid and the railway fork in the Torrejón de Velasco municipality south of the capital. The tests will last until the end of the coming week and will see three Renfe-operated Talgo-Bombardier S112 trains simulate a regular passenger service. The new double-track section of the so-called Alta Velocidad Española (AVE) network has a length of close to 36 kilometres and includes the 7.3-kilometre-long tunnel between Chamartín-Clara Campoamor station and Puerta de Atocha station. The tunnel effectively links the northern and southern parts of the peninsula. Upon conclusion of the testing programme, evacuation drills will be conducted in the tunnel. Once those are completed, the training of drivers on the new section will begin. ETCS Level 1 is implemented on the majority of the route, with Level 2 available near the Chamartín-Clara Campoamor station.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data