logo
ProjectUnder Implementation

Texas Aggregate Distributed Energy Resource (ADER) Pilot Project

The owner, status and timeline of this project. A free account opens every field.

Source: The Pew Charitable Trusts

An 80 MW pilot program established by the Texas commission to evaluate aggregated DER participation in the wholesale electricity market (ERCOT), testing customer-sited resources for grid reliability, peak stress reduction, and deferral of transmission and distribution investments. The pilot allows VPPs to bid into ERCOT and includes multiple participation models and telemetry requirements.

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT)
Location
Texas, United States of America
Updated
19 Nov 2026
Source
The Pew Charitable Trusts

ConstructChat

Ask ConstructChat about Texas Aggregate Distributed Energy Resource (ADER) Pilot Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Texas Aggregate Distributed Energy Resource (ADER) Pilot Project” is an infrastructure initiative in the Power Transmission sector, located in Texas, United States. Taiyo aggregates data on it from The Pew Charitable Trusts.

Participants

Not available for this record.

Status

Original status

under implementation

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

An 80 MW pilot program established by the Texas commission to evaluate aggregated DER participation in the wholesale electricity market (ERCOT), testing customer-sited resources for grid reliability, peak stress reduction, and deferral of transmission and distribution investments. The pilot allows VPPs to bid into ERCOT and includes multiple participation models and telemetry requirements.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

Source

Source

The Pew Charitable Trusts

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2026-04-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project