logo
ProjectPlanned

Texas AI and Bitcoin Mining Campus

One of 10,000+ projects Taiyo tracks in Texas.

Source: Crypto Briefing

Marathon Digital Holdings announced a deal to acquire a 1,200-plus acre powered land site in Matagorda County, Texas, to build a full-scale digital infrastructure campus with up to 2 gigawatts of power capacity. The campus will support Bitcoin mining and high-performance computing for AI workloads. The buildout is phased, with the first gigawatt targeted to be operational by October 2027 and the s

Status
Prospective
Sector
Power Generation (CCGT)
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Crypto Briefing

ConstructChat

Ask ConstructChat about Texas AI and Bitcoin Mining Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Texas AI and Bitcoin Mining Campus” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Texas, United States. Taiyo aggregates data on it from Crypto Briefing.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Marathon Digital Holdings announced a deal to acquire a 1,200-plus acre powered land site in Matagorda County, Texas, to build a full-scale digital infrastructure campus with up to 2 gigawatts of power capacity. The campus will support Bitcoin mining and high-performance computing for AI workloads. The buildout is phased, with the first gigawatt targeted to be operational by October 2027 and the second by April 2028. Construction is expected to begin in 2026, contingent on regulatory clearances. Marathon is partnering with Starwood Digital Ventures to develop and operate AI and HPC assets across selected sites.

Original sector

Technology

Budget

Location

Country

United States of America (USA)

State

Texas

Source

Source

Crypto Briefing

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-07-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project