logo

Texas AI Campus Data Center Project

Sector: Energy Storage • Location: Abilene, Texas, United States

Source: Bitget

Project
Under Construction

Crusoe is constructing a 900 megawatt AI-focused data center campus in Abilene, Texas, featuring two large-scale data center buildings and an integrated power generation facility designed for enhanced reliability and grid stability. The campus will support advanced AI workloads with energy-efficient infrastructure including liquid cooling and battery storage. The project aims to meet Microsoft's i

Status
Under Construction
Sector
Energy Storage, Data Center, Power Generation (CCGT)
Location
Abilene, Texas, United States of America
Updated
22 Jul 2026
Source
Bitget

ConstructChat

Ask ConstructChat about Texas AI Campus Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Texas AI Campus Data Center Project” is an infrastructure initiative in the Energy Storage sector, located in Abilene, Texas, United States. Taiyo aggregates data on it from Bitget.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Crusoe is constructing a 900 megawatt AI-focused data center campus in Abilene, Texas, featuring two large-scale data center buildings and an integrated power generation facility designed for enhanced reliability and grid stability. The campus will support advanced AI workloads with energy-efficient infrastructure including liquid cooling and battery storage. The project aims to meet Microsoft's increasing computational needs and is part of a broader expansion in AI infrastructure in the region.

Original sector

Technology Infrastructure

Location

Country

United States of America (USA)

State

Texas

City

Abilene

Source

Source

Bitget

URL

More Details

Record type

Project

Sector

Energy Storage, Data Center, Power Generation (CCGT)

Article published date

2026-03-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project