logo

Texas Battery Energy Storage Project

Sector: Energy Storage • Location: Texas, United States

Source: citybiz

Project
Planned

GridStor has acquired a 150 MW / 300 MWh battery storage project in Texas from Balanced Rock Power. This project aims to meet the rising power demand in the region, particularly from large industrial customers, and is expected to enhance the reliability of the ERCOT power system.

Status
Prospective
Sector
Energy Storage, Manufacturing (Industrial), Power Generation (CCGT)
Location
Texas, United States of America
Updated
22 Jul 2026
Source
citybiz

ConstructChat

Ask ConstructChat about Texas Battery Energy Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Texas Battery Energy Storage Project” is an infrastructure initiative in the Energy Storage sector, located in Texas, United States. Taiyo aggregates data on it from citybiz.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

GridStor has acquired a 150 MW / 300 MWh battery storage project in Texas from Balanced Rock Power. This project aims to meet the rising power demand in the region, particularly from large industrial customers, and is expected to enhance the reliability of the ERCOT power system.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

Source

Source

citybiz

URL

More Details

Record type

Project

Sector

Energy Storage, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project