Texas Battery Storage Project
Sector: Energy Storage • Location: Texas, United States
Source: Stock Titan
GridStor has acquired a 150 MW / 300 MWh battery storage project in Hidalgo County, Texas, from Balanced Rock Power. The project aims to enhance the resilience of the local power system and support economic growth in the region, with operations expected to begin by summer 2026.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Texas Battery Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GridStor has acquired a 150 MW / 300 MWh battery storage project in Hidalgo County, Texas, from Balanced Rock Power. The project aims to enhance the resilience of the local power system and support economic growth in the region, with operations expected to begin by summer 2026. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States
- Tampa Bay Seawater Desalination Plant
- Centrally Managed Pay-and-Display Parking
- Chevron Richmond Refinery
- Nestle Food and Distribution Centre, USA
- Pepperidge Farm Bakery Plant
- Baldock Solar Highway
- Doyle Drive Replacement / Presidio Parkway, San Francisco, US
- Newtown Creek (35-G) North and North Central Batteries
