logo
ProjectUnder Development

Texas Critical Data Centers (TCDC) Hyperscale Data Center Development

One of 10,000+ projects Taiyo tracks in Texas.

Source: BIC Magazine

Texas Critical Data Centers (TCDC) is a flagship 1+ gigawatt hyperscale data center development located in Ector County outside Odessa, Texas. The project involves the development of a large-scale, multi-phase AI and HPC campus on a 438-acre site, with recent land acquisition expanding the footprint. The project has advanced in land aggregation, engineering, power interconnection studies, and comm

Status
Prospective
Sector
Data Center, Power Generation (CCGT), Commercial
Location
Odessa, Texas, United States of America
Updated
22 Jul 2026
Source
BIC Magazine

ConstructChat

Ask ConstructChat about Texas Critical Data Centers (TCDC) Hyperscale Data Center Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Texas Critical Data Centers (TCDC) Hyperscale Data Center Development” is an infrastructure initiative in the Data Center sector, located in Odessa, Texas, United States. Taiyo aggregates data on it from BIC Magazine.

Participants

Not available for this record.

Status

Original status

under development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Texas Critical Data Centers (TCDC) is a flagship 1+ gigawatt hyperscale data center development located in Ector County outside Odessa, Texas. The project involves the development of a large-scale, multi-phase AI and HPC campus on a 438-acre site, with recent land acquisition expanding the footprint. The project has advanced in land aggregation, engineering, power interconnection studies, and commercial engagement.

Original sector

Digital Infrastructure

Budget

Location

Country

United States of America (USA)

State

Texas

City

Odessa

Source

Source

BIC Magazine

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Commercial

Article published date

2025-12-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project