Texas Critical Data Centers (TCDC) Project
Sector: Power Generation (CCGT) • Location: Odessa, Texas, United States
Source: Investing.com Australia
The Texas Critical Data Centers (TCDC) project is a flagship data center development initiative by New Era Helium Inc. located in Ector County, Texas, within the Permian Basin Energy Corridor. The project involves phased power development with an initial phase of 200 MW supported by adjacent generation, followed by expansions to 450 MW and eventually up to 1.4 gigawatts. The project emphasizes beh
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Texas Critical Data Centers (TCDC) project is a flagship data center development initiative by New Era Helium Inc. located in Ector County, Texas, within the Permian Basin Energy Corridor. The project involves phased power development with an initial phase of 200 MW supported by adjacent generation, followed by expansions to 450 MW and eventually up to 1.4 gigawatts. The project emphasizes behind-the-meter power solutions, strategic location advantages, and a partner-led development model involving Stream Data Centers and other specialized partners. The project is advancing through permitting, site readiness, leasing, and financing milestones concurrently to accelerate execution. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Morphotek’s New Biologics Production Facility
- Medical and Research Translation (MART) Building, Stony Brook University
- Bristol-Myers Squibb Manufacturing Plant, Devens, Massachusetts
- Cambridge Major Laboratories Active Pharmaceutical
- LS Skaggs Pharmacy Institute, University of Utah, Salt Lake City
- Djavad Mowafaghian Centre for Brain Health, Vancouver
