logo
ProjectUnder Construction

Texas Critical Data Centers (TCDC)

The owner, status and timeline of this project. A free account opens every field.

Source: Stock Titan

A scalable, up to 1 gigawatt AI and high-performance computing (HPC) campus under development in Ector County, Texas, designed to meet accelerating demand for compute capacity and clean energy. It integrates behind-the-meter power (off-grid) and real estate ("Powered Land") with digital infrastructure tailored for the AI compute market.

Status
Under Construction
Sector
Power Generation (CCGT), Data Center, Residential, Commercial
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about Texas Critical Data Centers (TCDC)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Texas Critical Data Centers (TCDC)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Texas, United States. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A scalable, up to 1 gigawatt AI and high-performance computing (HPC) campus under development in Ector County, Texas, designed to meet accelerating demand for compute capacity and clean energy. It integrates behind-the-meter power (off-grid) and real estate ("Powered Land") with digital infrastructure tailored for the AI compute market.

Original sector

Energy and Digital Infrastructure

Budget

Location

Country

United States of America (USA)

State

Texas

Source

Source

Stock Titan

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center, Residential, Commercial

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project