Texas Electric Vehicle Infrastructure Plan
The status, timeline and source of this project. A free account opens every field.
Source: Texas Department of Transportation (TxDOT)
As required by the National Electric Vehicle Infrastructure Formula Program, TxDOT submitted its Texas Electric Vehicle Infrastructure Plan to the federal Joint Office of Energy and Transportation. The submitted Plan can be found below. Review the Fiscal Year 2024 EV Infrastructure Plan TxDOT will continue to be open to questions and comments as it continues the NEVI program, and those can be subm
- Status
- Under Construction
- Sector
- Automotive, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Residential, Government
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TxDOT)
ConstructChat
Ask ConstructChat about Texas Electric Vehicle Infrastructure Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | implementation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | As required by the National Electric Vehicle Infrastructure Formula Program, TxDOT submitted its Texas Electric Vehicle Infrastructure Plan to the federal Joint Office of Energy and Transportation. The submitted Plan can be found below. Review the Fiscal Year 2024 EV Infrastructure Plan TxDOT will continue to be open to questions and comments as it continues the NEVI program, and those can be submitted online. We encourage the public to periodically visit this site for updates on new locations, FAQs, and further planning updates as the program progresses. TxDOT thanks the public for its extensive input on the Plan and looks forward to working with you as it develops. We also encourage you to explore the links below to find further details and interactive information about the progress of electric vehicle charging capabilities across the state. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Texas Department of Transportation (TxDOT) |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Residential, Government |
Article published date | 2023-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America (USA)
- Milgard Hall
- US 77 Victoria
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- FM 1179 (E Villa Maria Road and Briarcrest Drive) Raised Medians
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
