Texas Parks and Wildlife Department Grant Improvements 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Work Included: Excavation, filling, backfilling, and grading complete, as shown on the plans, and including: 1. Protect adjacent utility lines, streets, paving, curbs, gutters, and similar improvements. 2. Excavate/fill to required grades in conjunction with the Grading Plans. 3. Excavate/fill as required under walks, paving, drives, slabs, and approaches as indicated on the Grading Plans. 4. Fini
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Road, Power Transmission, Automotive, Commercial, Power Generation (CCGT)
- Location
- Dallas, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Texas Parks and Wildlife Department Grant Improvements 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work Included: Excavation, filling, backfilling, and grading complete, as shown on the plans, and including: 1. Protect adjacent utility lines, streets, paving, curbs, gutters, and similar improvements. 2. Excavate/fill to required grades in conjunction with the Grading Plans. 3. Excavate/fill as required under walks, paving, drives, slabs, and approaches as indicated on the Grading Plans. 4. Finish grade to within 0.05 foot for paved areas, walks, aprons, pads, and another exterior flatwork.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Dallas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Road, Power Transmission, Automotive, Commercial, Power Generation (CCGT) |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
