logo

Texas Public Utility Commission Large Load Interconnection Rule 16 TAC §25.194

Sector: Power Transmission • Location: Texas, United States

Source: Foley & Lardner LLP

Project
Proposed

Proposed rule by the Public Utility Commission of Texas mandating early-stage financial commitments, site control, and transparency for projects requiring a large load interconnection request (75 MW or larger). The rule requires execution of an Intermediate Agreement with proof of site control, a financial security deposit of $50,000 per megawatt, disclosure of substantially similar projects, and

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT)
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Foley & Lardner LLP

ConstructChat

Ask ConstructChat about Texas Public Utility Commission Large Load Interconnection Rule 16 TAC §25.194

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Texas Public Utility Commission Large Load Interconnection Rule 16 TAC §25.194” is an infrastructure initiative in the Power Transmission sector, located in Texas, United States. Taiyo aggregates data on it from Foley & Lardner LLP.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed rule by the Public Utility Commission of Texas mandating early-stage financial commitments, site control, and transparency for projects requiring a large load interconnection request (75 MW or larger). The rule requires execution of an Intermediate Agreement with proof of site control, a financial security deposit of $50,000 per megawatt, disclosure of substantially similar projects, and execution of an Interconnection Agreement within 30 days of ERCOT study completion.

Original sector

Energy & Infrastructure

Location

Country

United States of America (USA)

State

Texas

Source

Source

Foley & Lardner LLP

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2026-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project