logo

TGE Apas Kiri Geothermal Plant

Sector: Geothermal • Location: Malaysia

Source: World Bank Group

Project
Active

Tawau Green Energy Sdn Bhd (TGE), was planning the development of the 30MW Apas Kiri geothermal plant, in the District of Tawau, Sabah. TGE was incorporated in the State of Sabah. Continental Energy (OTC:CPPXF) held a 10% equity stake in the company.

Geological studies were conducted between December 2008 and January 2009 together with the Laboratory of Geothermal Energy, University of Indonesia

Status
Prospective
Sector
Geothermal, Natural Gas, Car parking, Education, Oil and Gas, Power Generation (CCGT), Road, Government, Automotive, Commercial
Location
Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TGE Apas Kiri Geothermal Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TGE Apas Kiri Geothermal Plant” is an infrastructure initiative in the Geothermal sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tawau Green Energy Sdn Bhd (TGE), was planning the development of the 30MW Apas Kiri geothermal plant, in the District of Tawau, Sabah. TGE was incorporated in the State of Sabah. Continental Energy (OTC:CPPXF) held a 10% equity stake in the company. Geological studies were conducted between December 2008 and January 2009 together with the Laboratory of Geothermal Energy, University of Indonesia. Maximum capacity was 67MW, on a depth of 2.5km. In November 2011, the developer received approval of a Renewable Energy Power Purchase Agreement (REPPA) from SESB. Under the PPA, the SESB offered a fixed tariff of MYR 0.21/kWh (US$c 7), for a period of 21 years. PT Pisga and Aktif FA served as consultants to the project. Chemsain Consultant conducted air test for methane gas. Land lease agreement was signed between Sabah Parks and TGE in August 2012. Stakeholder meetings were organized in October 2012. Commissioning was expected for early-2015. May 25th 2012, the project signed a Facilitation Fund Agreement under PPP concept with UKAS (the governmental PPP unit) and Bank Pembangunan Malaysia. The government provided a RM35 million (US$11.5 million) grant towards construction cost, to be disbursed by Bank Pembangunan Malaysia. The grant was exclusively to be used for constructing access roads and making related infrastructure improvements. The project has applied for UNFCCC CDM financing (282,400 metric tons CO2). Total cost was estimated at MYR419 million (US$136.7 million). http://www.tgepower.com/events4.html Investment Weekly News, Oil and Gas Companies: Continental Buys First Stake in Geothermal Energy Project, 26 May 2012. http://www.continentalenergy.com/pages/news.php?id=113

Original sector

Energy

Procurement method

Budget

Location

Country

Malaysia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Natural Gas, Car parking, Education, Oil and Gas, Power Generation (CCGT), Road, Government, Automotive, Commercial

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project