TGE Apas Kiri Geothermal Plant

Sector: Road • Location: Malaysia

Source: World Bank Group

Project
Active

Tawau Green Energy Sdn Bhd (TGE), was planning the development of the 30MW Apas Kiri geothermal plant, in the District of Tawau, Sabah. TGE was incorporated in the State of Sabah. Continental Energy (OTC:CPPXF) held a 10% equity stake in the company.

Geological studies were conducted between December 2008 and January 2009 together with the Laboratory of Geothermal Energy, University of Indonesia

Project Information FAQ

Project Information

4 Q
The project “TGE Apas Kiri Geothermal Plant” is an infrastructure initiative in the Road sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Tawau Green Energy Sdn Bhd (TGE), was planning the development of the 30MW Apas Kiri geothermal plant, in the District of Tawau, Sabah. TGE was incorporated in the State of Sabah. Continental Energy (OTC:CPPXF) held a 10% equity stake in the company. Geological studies were conducted between December 2008 and January 2009 together with the Laboratory of Geothermal Energy, University of Indonesia. Maximum capacity was 67MW, on a depth of 2.5km. In November 2011, the developer received approval of a Renewable Energy Power Purchase Agreement (REPPA) from SESB. Under the PPA, the SESB offered a fixed tariff of MYR 0.21/kWh (US$c 7), for a period of 21 years. PT Pisga and Aktif FA served as consultants to the project. Chemsain Consultant conducted air test for methane gas. Land lease agreement was signed between Sabah Parks and TGE in August 2012. Stakeholder meetings were organized in October 2012. Commissioning was expected for early-2015. May 25th 2012, the project signed a Facilitation Fund Agreement under PPP concept with UKAS (the governmental PPP unit) and Bank Pembangunan Malaysia. The government provided a RM35 million (US$11.5 million) grant towards construction cost, to be disbursed by Bank Pembangunan Malaysia. The grant was exclusively to be used for constructing access roads and making related infrastructure improvements. The project has applied for UNFCCC CDM financing (282,400 metric tons CO2). Total cost was estimated at MYR419 million (US$136.7 million). http://www.tgepower.com/events4.html Investment Weekly News, Oil and Gas Companies: Continental Buys First Stake in Geothermal Energy Project, 26 May 2012. http://www.continentalenergy.com/pages/news.php?id=113

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data