TH-Distr. Autom & Relia
Sector: Power Generation (CCGT) • Location: Thailand
Source: World Bank Group
The main objectives of the Distribution Automation and Reliability Improvement Project for Thailand are to: (a) improve through automation the efficiency and reliability of Provincial Electricity Authority's (PEA) distribution network and strengthen its operational capabilities; (b) upgrade the distribution system in the south of Thailand to meet demand growth efficiently and at least cost; (c) st
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Government, Residential
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TH-Distr. Autom & Relia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Distribution Automation and Reliability Improvement Project for Thailand are to: (a) improve through automation the efficiency and reliability of Provincial Electricity Authority's (PEA) distribution network and strengthen its operational capabilities; (b) upgrade the distribution system in the south of Thailand to meet demand growth efficiently and at least cost; (c) strengthen PEA's engineering and management capabilities through the integration of its Geographical Information System with the proposed Supervisory Control and Data Acquisition (SCADA) system; (d) help rationalize PEA system's interfacing arrangements with the Electricity Generating Authority of Thailand (EGAT), an important step towards its regionalization and subsequent privatization; and (e) help investigate the issues and options for the regulatory framework of the energy sector. The components of the project are: (a) Distribution Automation System comprising: (1) six control centers with SCADA facilities, and consolidation reporting facilities in PEA's Head Office; (2) remote-controlled distribution line switching equipment; (3) fault indicators, remote terminal units and ultra high frequency communications links; and (4) construction of six control centers and modification of existing substations; (b) upgrading distribution in South Thailand comprising the construction of transmission lines and associated substations; (c) consulting services for the detailed design and project management of the Distribution Automation System, including training of PEA technical staff, and upgrading distribution in south Thailand; and (d) technical assistance for the rationalization of PEA's interfacing arrangements with EGAT and study of issues and options for the regulatory framework of the energy sector. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
