TH-Distr. Autom & Relia
Sector: Power Generation (CCGT) • Location: Thailand
Source: World Bank Group
The main objectives of the Distribution Automation and Reliability Improvement Project for Thailand are to: (a) improve through automation the efficiency and reliability of Provincial Electricity Authority's (PEA) distribution network and strengthen its operational capabilities; (b) upgrade the distribution system in the south of Thailand to meet demand growth efficiently and at least cost; (c) st
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The main objectives of the Distribution Automation and Reliability Improvement Project for Thailand are to: (a) improve through automation the efficiency and reliability of Provincial Electricity Authority's (PEA) distribution network and strengthen its operational capabilities; (b) upgrade the distribution system in the south of Thailand to meet demand growth efficiently and at least cost; (c) strengthen PEA's engineering and management capabilities through the integration of its Geographical Information System with the proposed Supervisory Control and Data Acquisition (SCADA) system; (d) help rationalize PEA system's interfacing arrangements with the Electricity Generating Authority of Thailand (EGAT), an important step towards its regionalization and subsequent privatization; and (e) help investigate the issues and options for the regulatory framework of the energy sector. The components of the project are: (a) Distribution Automation System comprising: (1) six control centers with SCADA facilities, and consolidation reporting facilities in PEA's Head Office; (2) remote-controlled distribution line switching equipment; (3) fault indicators, remote terminal units and ultra high frequency communications links; and (4) construction of six control centers and modification of existing substations; (b) upgrading distribution in South Thailand comprising the construction of transmission lines and associated substations; (c) consulting services for the detailed design and project management of the Distribution Automation System, including training of PEA technical staff, and upgrading distribution in south Thailand; and (d) technical assistance for the rationalization of PEA's interfacing arrangements with EGAT and study of issues and options for the regulatory framework of the energy sector. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
