logo
ProjectClosed

TH-Distr. Autom & Relia

Sector: Power Generation (CCGT) • Location: Thailand

Source: World Bank Group

The main objectives of the Distribution Automation and Reliability Improvement Project for Thailand are to: (a) improve through automation the efficiency and reliability of Provincial Electricity Authority's (PEA) distribution network and strengthen its operational capabilities; (b) upgrade the distribution system in the south of Thailand to meet demand growth efficiently and at least cost; (c) st

Status
Closed
Sector
Power Generation (CCGT), Commercial, Government, Residential
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TH-Distr. Autom & Relia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TH-Distr. Autom & Relia” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Distribution Automation and Reliability Improvement Project for Thailand are to: (a) improve through automation the efficiency and reliability of Provincial Electricity Authority's (PEA) distribution network and strengthen its operational capabilities; (b) upgrade the distribution system in the south of Thailand to meet demand growth efficiently and at least cost; (c) strengthen PEA's engineering and management capabilities through the integration of its Geographical Information System with the proposed Supervisory Control and Data Acquisition (SCADA) system; (d) help rationalize PEA system's interfacing arrangements with the Electricity Generating Authority of Thailand (EGAT), an important step towards its regionalization and subsequent privatization; and (e) help investigate the issues and options for the regulatory framework of the energy sector. The components of the project are: (a) Distribution Automation System comprising: (1) six control centers with SCADA facilities, and consolidation reporting facilities in PEA's Head Office; (2) remote-controlled distribution line switching equipment; (3) fault indicators, remote terminal units and ultra high frequency communications links; and (4) construction of six control centers and modification of existing substations; (b) upgrading distribution in South Thailand comprising the construction of transmission lines and associated substations; (c) consulting services for the detailed design and project management of the Distribution Automation System, including training of PEA technical staff, and upgrading distribution in south Thailand; and (d) technical assistance for the rationalization of PEA's interfacing arrangements with EGAT and study of issues and options for the regulatory framework of the energy sector.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project