logo

Tha Ngone Bridge Project

Sector: Commercial • Location: Lao PDR

Source: World Bank Group

Project
Cancelled

In 1992, the Government of Lao PDR granted a 15-year BOT contract to build and operate a vehicular bridge across the Nam Ngum River at Tha Ngone to a joint venture between Australina Transfield Holdings and the government. The project was a 200 meter steel box girder bridge to be a more cost effective and time efficient solution than the existing ferry. It was located on a major arterial route abo

Status
Closed
Sector
Commercial, Bridge, Road, Steel, Government, Metal
Location
Laos
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tha Ngone Bridge Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tha Ngone Bridge Project” is an infrastructure initiative in the Commercial sector, located in Lao PDR. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 1992, the Government of Lao PDR granted a 15-year BOT contract to build and operate a vehicular bridge across the Nam Ngum River at Tha Ngone to a joint venture between Australina Transfield Holdings and the government. The project was a 200 meter steel box girder bridge to be a more cost effective and time efficient solution than the existing ferry. It was located on a major arterial route about 25 km outside Vientiane, Laos capital. Financing was arranged by Transfield on behalf of the joint venture company from a Laos bank on a project finance basis with some co-finance being provided by an Australian financial institution. Construction commenced in October 1993, and the bridge opened to traffic in July 1994. The project, which submitted by Transfield Holdings as an unsolicited proposal, had exclusive rights and, therefore, the ferry had to stop operating. The traffic volume was much lower than the expected by sponsors. Fewer logging trucks were crossing the bridge and many motorists were willing to take longer alternative routes to avoid paying tolls. Tolls increased to a point they doubled the cost of ferry. Such toll created many complaints for Laos government, which decided to exercise its option to buy out Transfield's share in bridge at a pre-agreed price in 1995. None None

Original sector

Transport

Location

Country

Laos

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Road, Steel, Government, Metal

Article published date

2024-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project