logo

Tha Ngone Bridge Project

Sector: Road • Location: Lao PDR

Source: World Bank Group

Project
Cancelled

In 1992, the Government of Lao PDR granted a 15-year BOT contract to build and operate a vehicular bridge across the Nam Ngum River at Tha Ngone to a joint venture between Australina Transfield Holdings and the government. The project was a 200 meter steel box girder bridge to be a more cost effective and time efficient solution than the existing ferry. It was located on a major arterial route abo

Project Information FAQ

Project Information

5 Q
The project “Tha Ngone Bridge Project” is an infrastructure initiative in the Road sector, located in Lao PDR. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 1992, the Government of Lao PDR granted a 15-year BOT contract to build and operate a vehicular bridge across the Nam Ngum River at Tha Ngone to a joint venture between Australina Transfield Holdings and the government. The project was a 200 meter steel box girder bridge to be a more cost effective and time efficient solution than the existing ferry. It was located on a major arterial route about 25 km outside Vientiane, Laos capital. Financing was arranged by Transfield on behalf of the joint venture company from a Laos bank on a project finance basis with some co-finance being provided by an Australian financial institution. Construction commenced in October 1993, and the bridge opened to traffic in July 1994. The project, which submitted by Transfield Holdings as an unsolicited proposal, had exclusive rights and, therefore, the ferry had to stop operating. The traffic volume was much lower than the expected by sponsors. Fewer logging trucks were crossing the bridge and many motorists were willing to take longer alternative routes to avoid paying tolls. Tolls increased to a point they doubled the cost of ferry. Such toll created many complaints for Laos government, which decided to exercise its option to buy out Transfield's share in bridge at a pre-agreed price in 1995. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data