Thacker Pass Lithium Project Electrification
Sector: Manufacturing (Industrial) • Location: Nevada, United States of America
Source: ABB Group
ABB has been selected by Lithium Americas Corp. to provide electrification technologies for the Thacker Pass Lithium Project in Nevada, which is the largest known measured and indicated lithium resource in North America. The project aims to produce up to 40,000 metric tons of lithium carbonate annually, supporting the manufacture of batteries for approximately 800,000 electric vehicles per year. A
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Electric Vehicles (EVs), Energy Storage, Automotive, Power Generation (CCGT)
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- ABB Group
ConstructChat
Ask ConstructChat about Thacker Pass Lithium Project Electrification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ABB has been selected by Lithium Americas Corp. to provide electrification technologies for the Thacker Pass Lithium Project in Nevada, which is the largest known measured and indicated lithium resource in North America. The project aims to produce up to 40,000 metric tons of lithium carbonate annually, supporting the manufacture of batteries for approximately 800,000 electric vehicles per year. ABB will deliver integrated, high-efficiency power infrastructure including switchgear, motor control centers, variable speed drives, auxiliary power distribution packages, and a site-wide power management system, all integrated within optimized electrical buildings. |
Original sector | Mining and Minerals |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | ABB Group |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Electric Vehicles (EVs), Energy Storage, Automotive, Power Generation (CCGT) |
Article published date | 2025-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
