logo

Thacker Pass Lithium Project Phase 1

Sector: Energy Storage • Location: Nevada, United States

Source: Stock Titan

Project
Under Construction

Development of Phase 1 of the Thacker Pass lithium project in Humboldt County, northern Nevada, designed for nominal production capacity of 40,000 tonnes per year of battery-quality lithium carbonate. The project is owned by a joint venture between Lithium Americas (62% interest) and General Motors Holdings LLC (38% interest). Project financing includes a $2.23 billion loan from the U.S. Departmen

Status
Under Construction
Sector
Energy Storage
Location
Nevada, United States of America
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about Thacker Pass Lithium Project Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Thacker Pass Lithium Project Phase 1” is an infrastructure initiative in the Energy Storage sector, located in Nevada, United States. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Development of Phase 1 of the Thacker Pass lithium project in Humboldt County, northern Nevada, designed for nominal production capacity of 40,000 tonnes per year of battery-quality lithium carbonate. The project is owned by a joint venture between Lithium Americas (62% interest) and General Motors Holdings LLC (38% interest). Project financing includes a $2.23 billion loan from the U.S. Department of Energy, with mechanical completion targeted for late 2027.

Original sector

Mining

Budget

Location

Country

United States of America (USA)

State

Nevada

Source

Source

Stock Titan

URL

More Details

Record type

Project

Sector

Energy Storage

Article published date

2026-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project