Thailand: Bioenergy Sugar Ethanol Wastewater Management Project
Sector: Water Supply and Storage • Location: Thailand
Source: World Bank Group
The objective of the Bio Energy Wastewater Management and Methane Capturing for Electricity Project for Thailand is to reduce greenhouse gas (GHG) emissions through: (i) the avoidance of methane emissions from the wastewater treatment system of the ethanol plant; and (ii) the displacement of electricity produced from fossil fuel to electricity from methane collected from the new wastewater treatme
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objective of the Bio Energy Wastewater Management and Methane Capturing for Electricity Project for Thailand is to reduce greenhouse gas (GHG) emissions through: (i) the avoidance of methane emissions from the wastewater treatment system of the ethanol plant; and (ii) the displacement of electricity produced from fossil fuel to electricity from methane collected from the new wastewater treatment system. There are three components to the project; the first component being improvement of the wastewater management system. This component will improve the management of wastewater and sludge generated by the ethanol plant. The second component is the waste-to-energy and transmission facility. This component will capture methane for electricity generation with the installed capacity of 3.2 MW and annual output of around 18 GWh, which will be sold to the Provincial Electricity Authority (PEA) of Thailand under the Very Small Power Producer Program (VSPP). The electricity will be transmitted through the upgraded transmission line to connect to the provincial grid sub-station. Finally, the third component is the carbon finance transaction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
