logo

Thailand Metropolitan Distribution Reinforcement

Sector: Power Generation (CCGT) • Location: Thailand

Source: World Bank Group

Project
Closed

The main objectives of the Metropolitan Distribution Reinforcement Project are to: (i) improve the reliability of the distribution system and contain losses at current levels, while meeting the projected rapid increase in electricity demand; (ii) assist in the organization restructuring of the Metropolitan Electricity Authority (MEA) leading to its commercialization and corporatization; and (iii)

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Thailand Metropolitan Distribution Reinforcement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Thailand Metropolitan Distribution Reinforcement” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Metropolitan Distribution Reinforcement Project are to: (i) improve the reliability of the distribution system and contain losses at current levels, while meeting the projected rapid increase in electricity demand; (ii) assist in the organization restructuring of the Metropolitan Electricity Authority (MEA) leading to its commercialization and corporatization; and (iii) introduce demand-side management (DSM) capabilities in MEA's organization thus deepening the DSM focus in the country's most rapidly growing area. The components of the project are the following: 1) investment component including transmission and distribution substation system; transmission line systems; and distribution system; 2) policy component providing for a major restructuring of MEA's organization; and 3) institutional development component comprising: (i) setting up of an Appliance Testing Laboratory; (ii) introduction of a system-wide Load Research program; (iii) implementation of a load control program; (iv) establishment of an Energy Service Company; and (v) technical assistance.

Original sector

Energy and Extractives

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project