Thailand Sapthip Biogas Project

One of 10,000+ projects Taiyo tracks in Thailand.

Source: World Bank Group

The objective of the Sapthip Wastewater Biogas and Renewable Energy Project for Thailand is to reduce greenhouse gas emissions from the fossil fuel used at the Sapthip Co., Ltd. bioethanol plant and from the methane produced from the plant's wastewater through the recovery of methane from wastewater treatment and the use of the recovered methane and solid residue from plant operation as fuel. Ther

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Biomass, Natural Gas, Government
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Thailand Sapthip Biogas Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Thailand Sapthip Biogas Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Sapthip Wastewater Biogas and Renewable Energy Project for Thailand is to reduce greenhouse gas emissions from the fossil fuel used at the Sapthip Co., Ltd. bioethanol plant and from the methane produced from the plant's wastewater through the recovery of methane from wastewater treatment and the use of the recovered methane and solid residue from plant operation as fuel. There are two components to the project, the first component being wastewater system with biogas collection. The system will recover and combust the biogas, the majority of which is methane (CH4), a greenhouse gases that, without the project, will have been released directly into the atmosphere by the open-lagoon wastewater treatment systems commonly used in Thailand. The wastewater undergoes a staged treatment process that relies on up-flow anaerobic sludge blanket (UASB) reactors to generate and capture most of the methane-containing biogas used in the project. Finally, the second component is the renewable energy use. Two 20-ton-per-hour-capacity boilers will be employed to supply the average of 20 tons per hour of steam required for the ethanol plant and to provide sufficient backup capacity in cases of plant shutdown or maintenance. Instead of being dependent on the fossil fuel coal, the boilers will utilize a combination of renewable energy, including the biogas recovered from the wastewater treatment process (58,000 cubic meters per day) and the solid residue ('wet cake') from the distillation column which is dried using waste heat from the boiler (30 tons per day). It is anticipated the boiler will rely on 70 percent biogas and 30 percent wet cake for energy. Excess biogas produced during operation will be used for on-site electricity generation using commercially available biogas-fired generators, reducing greenhouse gas emissions through the substitution for fossil fuel based grid electricity that will have been used by the plant without the project.

Original sector

Industry, Trade and Services

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Biomass, Natural Gas, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project