logo

Thames House / Ignacio Szulman arquitecto

Sector: Cement

Source: ArchDaily

Project
Closed

A final operation introduces a brick tile object inside the house, shaping the different functions: from the bathroom and kitchen volumes, the openings that connect to the exterior, to the fixed furniture of the house. Brick tiles are chosen for their human scale, more adaptable than concrete, and because they are the predominant material in the existing construction. Inside, the brick tiles are p

Project Information FAQ

Project Information

3 Q
The project “Thames House / Ignacio Szulman arquitecto” is an infrastructure initiative in the Cement sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A final operation introduces a brick tile object inside the house, shaping the different functions: from the bathroom and kitchen volumes, the openings that connect to the exterior, to the fixed furniture of the house. Brick tiles are chosen for their human scale, more adaptable than concrete, and because they are the predominant material in the existing construction. Inside, the brick tiles are painted white to create a contrast, while outside they are left exposed, blending the old walls with the new brick tiles.Text description provided by the architects.A house that underwent many interventions over time, went from being a house to a rehabilitation center. The new owners bought the place to turn it back into a residence, initially just for the couple. They needed a single-story house with the condition of being able to expand in the future to a second level.The second operation involves protecting this old construction by surrounding it with a new reinforced concrete structure that also lays the foundation for future growth. The concrete is hammered in some areas to resemble the texture of the old broken bricks and create a new unity.The first intervention consists of opening up the space, which involves demolishing parts of the back and front to create 3 courtyards. The oldest section of the original construction is preserved, with the old brick walls and ceilings left exposed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data