logo

Thames Tideway Tunnel, Central Section

Sector: Manufacturing (Industrial) • Location: London, United Kingdom

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Thames Tideway Tunnel, Central Section London, United Kingdom £745 M Budget 12.7km New Sewer Tunnel Length Reduction 90% In Sewage-Related Waste 9000+ Jobs Created The Thames Tideway Tunnel is the largest infrastructure project ever undertaken by the UK water industry. It is essential to tackling overflows from London's Victorian sewers into the Thames for at le

Project Information FAQ

Project Information

5 Q
The project “Thames Tideway Tunnel, Central Section” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in London, United Kingdom. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Thames Tideway Tunnel, Central Section London, United Kingdom £745 M Budget 12.7km New Sewer Tunnel Length Reduction 90% In Sewage-Related Waste 9000+ Jobs Created The Thames Tideway Tunnel is the largest infrastructure project ever undertaken by the UK water industry. It is essential to tackling overflows from London's Victorian sewers into the Thames for at least the next 100 years. The project will create over 4,000 sustainable jobs and another 5,000 indirectly. It will also offer hundreds of local apprenticeships and work placements, leaving a lasting legacy in the heart of London. London's sewerage system relies on a series of combined sewer overflows, designed to discharge into the Thames during heavy storms. This system releases sewage into the river on a weekly basis, reaching over 55 million tonnes annually. We are delivering the central section while working alongside two other contracting teams in the west and east. Our scope includes development consent, design, and construction of the new sewer tunnel. With a total length of 12.7km, the central tunnel will be driven using two purpose-built 8.8m diameter Earth Pressure Balance (EPB) TBMs, and will run up to 60m deep between Fulham and Bermondsey. In addition, the works include the construction of eight shafts and pumping stations, logistics, and soil disposal via the barges on the river. Collaboration is a key factor for successful delivery. We have established a Procurement Alliance, in collaboration with Thames Water, the different Main Works Contractors, and the System Integrator (our sister company Amey) to ensure that a best-for-project approach is consistently followed. This effective approach to risk management and mitigation ensures that the project is delivered to the highest standards. Added Value Consistent approach to design optimisation and value engineering to reduce cost and improve efficiencyUse of the River Thames for transport and logistics to minimise movements by road, including TBM sections delivered by river and 2.7million tons of TBM spoil removedThe Legacy Programme will benefit ecology, public health, the environment and the appearance of the Thames through formal commitments on five key themes: environment, health and safety, economy, people, and placesInnovative implementation of hybrid cutting wheels on the hydromill to increase production and improve efficiency for the integral diaphragm walls Over 3,000 authorizations achieved seven months ahead of schedule. Thames Tideway Tunnel | Ferrovial

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data