logo
ProjectFinanced

THAMES TIDEWAY TUNNEL

Financed · United Kingdom

Source: European Investment Bank (EIB)

The construction and operation of a 25 km long, up to 7.2m diameter tunnel following the route of the River Thames under the centre of London to capture storm discharges of raw sewage that presently overflow directly into the river. The aim of the Project is to comply with the EU Urban Wastewater Treatment Directive and to improve the quality of the tidal section of the Thames.

Status
Prospective
Sector
Tunnel, Water Supply and Storage, Road, Waste Processing and Treatment, Hospital, Power Transmission, Hotel, Power Generation (CCGT), Government
Location
United Kingdom
Updated
19 Nov 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about THAMES TIDEWAY TUNNEL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “THAMES TIDEWAY TUNNEL” is an infrastructure initiative in the Tunnel sector, located in United Kingdom. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Sponsoring Agency

Status

Original status

financed

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The construction and operation of a 25 km long, up to 7.2m diameter tunnel following the route of the River Thames under the centre of London to capture storm discharges of raw sewage that presently overflow directly into the river. The aim of the Project is to comply with the EU Urban Wastewater Treatment Directive and to improve the quality of the tidal section of the Thames.

Original sector

Water, sewerage

Budget

Location

Country

United Kingdom (UK)

Source

Source reliability

High

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Tunnel, Water Supply and Storage, Road, Waste Processing and Treatment, Hospital, Power Transmission, Hotel, Power Generation (CCGT), Government

Article published date

2023-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project