Thames Valley Parkway Extension
Pre-design · Ontario · Last reported Jan 2025
Source: Dodge
Extending along all three branches of the Thames River for a collective total of 47 kilometres, the Thames Valley Parkway (TVP) is a well-used multi-use pathway. The extension will fill a gap between Wellington and Maitland streets and will better connect the TVP to the SoHo neighbourhood
- Status
- Prospective
- Sector
- Raw Materials, Government, Road, Commercial, Car parking, Automotive
- Location
- London, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Thames Valley Parkway Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Extending along all three branches of the Thames River for a collective total of 47 kilometres, the Thames Valley Parkway (TVP) is a well-used multi-use pathway. The extension will fill a gap between Wellington and Maitland streets and will better connect the TVP to the SoHo neighbourhood |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | London |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Government, Road, Commercial, Car parking, Automotive |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
