Thane Ghodbunder Toll Road Private Limited
Sector: Automotive • Location: Maharashtra, India
Source: World Bank Group
In December 2005, the Maharashtra State Road Development Corporation (MSRDC) signed a 15 year concession contract (including 18 month of construction period) to India’s Ideal Road Builder Pvt. Ltd. to strengthen the 14.9 km section on State Highway 42(SH42) between Thane and Ghodabunder in the state of Maharashtra.
Under the contract, Ideal Road Builder Pvt. Ltd. (IRBPL) was responsible for the i
- Status
- Prospective
- Sector
- Automotive, Cement, Road, Manufacturing (Industrial), Government
- Location
- Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Thane Ghodbunder Toll Road Private Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2005, the Maharashtra State Road Development Corporation (MSRDC) signed a 15 year concession contract (including 18 month of construction period) to India’s Ideal Road Builder Pvt. Ltd. to strengthen the 14.9 km section on State Highway 42(SH42) between Thane and Ghodabunder in the state of Maharashtra. Under the contract, Ideal Road Builder Pvt. Ltd. (IRBPL) was responsible for the improvement of 4.4 Km four lane stretch, for providing concrete pavement on 7.1 Km four lane stretch out of existing six lane road and providing concrete pavement on 3.3 Km six lane stretch out of existing ten lane road. The total project lenght was 14.9 km. The project was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. IRBPL established a special purpose vehicle Thane - Ghodabunder Toll Road Pvt. Ltd., to implement the project. IRBPL won the tender through competitive bidding, conducted by MSRDC. While the bidding details were not known at the time of collection of information, it is known that the SPV was to recover the capital costs and operating costs including returns through tolls during the concession period (excluding construction period). The concession agreement for the project was signed in December 2005. The construction cost of the project was estimated at INR893.44 million (US$ 20.3 million). In addition, the concessionaire had to make an upfront payment to MSRDC of INR 1404 million (US$31.8 million). Construction on the project began in December 2005 and was completed by June 2007. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
State | Maharashtra |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Cement, Road, Manufacturing (Industrial), Government |
Article published date | 2024-05-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in India
- Mundra Ultra Mega Power Plant Gujarat
- Dholera Solar Park Gujarat
- ONGC Tripura Power Plant
- Tuppadahalli Wind Farm
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Abhijeet MADC Nagpur Energy Private Limited (AMNEPL
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
