logo
ProjectAwarded

Thane Municipal Solid Waste Pre-processing Plant

The owner, status and timeline of this project. A free account opens every field.

Source: mint

Antony Lara Enviro Solutions, a subsidiary of Antony Waste, has been awarded a contract by the Thane Municipal Corporation to establish a 600–800 TPD solid waste pre-processing plant. The project includes design, build, operate, and transfer (DBOT) on land owned by Thane Municipal Corporation at Atkoli, Taluka Bhiwandi. The scope covers setting up a Material Recovery Facility (MRF) for segregation

Status
Closed
Sector
Biomass, Waste Processing and Treatment, Government
Location
Thane, Maharashtra, India
Updated
22 Jul 2026
Source
mint

ConstructChat

Ask ConstructChat about Thane Municipal Solid Waste Pre-processing Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Thane Municipal Solid Waste Pre-processing Plant” is an infrastructure initiative in the Biomass sector, located in Thane, Maharashtra, India. Taiyo aggregates data on it from mint.

Participants

Sponsoring Agency

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Antony Lara Enviro Solutions, a subsidiary of Antony Waste, has been awarded a contract by the Thane Municipal Corporation to establish a 600–800 TPD solid waste pre-processing plant. The project includes design, build, operate, and transfer (DBOT) on land owned by Thane Municipal Corporation at Atkoli, Taluka Bhiwandi. The scope covers setting up a Material Recovery Facility (MRF) for segregation of mixed solid waste, including design, engineering, construction, commissioning, and operation and maintenance for 10 years.

Original sector

Municipal Solid Waste Management

Budget

Location

Country

India

State

Maharashtra

City

Thane

Source

Source

mint

URL

More Details

Record type

Project

Sector

Biomass, Waste Processing and Treatment, Government

Article published date

2025-12-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project