Thatcher L&D Ouachita River Construction SOURCES SOUGHT
Sector: Waste Processing and Treatment • Location: Calion, Arkansas, United States of America
Source: Dodge
The U.S. Army Corps of Engineers, Vicksburg District, requests letters of interest from qualified construction contractors interested in performing construction services for Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas. The work consists of furnishing all plant, labor, materials, and equipment for mobilization and demobilization; cofferdams and dewatering; cons
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Hydro, Commercial, Cement
- Location
- Calion, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Thatcher L&D Ouachita River Construction SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding, pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The U.S. Army Corps of Engineers, Vicksburg District, requests letters of interest from qualified construction contractors interested in performing construction services for Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas. The work consists of furnishing all plant, labor, materials, and equipment for mobilization and demobilization; cofferdams and dewatering; construction of the new stoplog slots and associated work, including demolition of existing concrete,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Calion |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Hydro, Commercial, Cement |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
