logo

The Barn Michigan Data Centre Project

Sector: Water Supply and Storage • Location: Saline Township, Michigan, United States

Source: DQ

Project
Planned

The Barn is a USD 10 billion data centre project located in Saline Township, Michigan. It is part of Oracle's Satargate initiative, a joint effort with OpenAI and SoftBank to build massive AI infrastructure. The project includes three single-story buildings, each spanning 550,000 square feet, with a closed-loop cooling system to minimize water consumption. The campus will provide computing power t

Status
Prospective
Sector
Water Supply and Storage, Rail, Power Generation (CCGT), Data Center
Location
Saline Township, Michigan, United States of America
Updated
22 Jul 2026
Source
DQ

ConstructChat

Ask ConstructChat about The Barn Michigan Data Centre Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “The Barn Michigan Data Centre Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Saline Township, Michigan, United States. Taiyo aggregates data on it from DQ.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Barn is a USD 10 billion data centre project located in Saline Township, Michigan. It is part of Oracle's Satargate initiative, a joint effort with OpenAI and SoftBank to build massive AI infrastructure. The project includes three single-story buildings, each spanning 550,000 square feet, with a closed-loop cooling system to minimize water consumption. The campus will provide computing power to train and run OpenAI's next-generation models.

Original sector

Technology Infrastructure

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Saline Township

Source

Source

DQ

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Rail, Power Generation (CCGT), Data Center

Article published date

2025-12-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project