logo

The Boro

Sector: Car parking • Location: Tysons, Virginia, United States of America

Source: Clark Construction

Project

The Clark-delivered portion of The Boro, a 16-acre mixed-use development in Northern Virginia, consists of three residential buildings, a five-story office building and a vibrant mix of retail and entertainment spaces. The three residential buildings - Rise, Bolden, and Verse - range in size from 13 to 32 stories. The 32-story Rise has more than 400 apartments, with strong architectural spaces bal

Project Information FAQ

Project Information

4 Q
The project “The Boro” is an infrastructure initiative in the Car parking sector, located in Tysons, Virginia, United States of America. Taiyo aggregates data on it from Clark Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Clark-delivered portion of The Boro, a 16-acre mixed-use development in Northern Virginia, consists of three residential buildings, a five-story office building and a vibrant mix of retail and entertainment spaces. The three residential buildings - Rise, Bolden, and Verse - range in size from 13 to 32 stories. The 32-story Rise has more than 400 apartments, with strong architectural spaces balanced by complex, neutral finishes that have an intimate, tactile quality. Overlooking Boro Park, Bolden offers 133 apartment residences that combine sumptuous interiors with a myriad of social spaces. Both Rise and Bolden sit atop one of the largest Whole Foods Markets in the country, and feature fitness centers, yoga studios, club rooms with entertainment kitchens, and pools with lounging areas. Verse, the third residential component, is a 25-story condominium building containing 140 luxury units and amenity-rich features such as a high-performance fitness studio, pet spa, and entertainment kitchen. Verse is designed to inspire community and connection through the pedestrian-friendly streets, green public spaces to lounge and play, everyday conveniences, and high-end shopping. Rise, Bolden, and Verse residential towers are all connected on the 9th level by a "SkyPark", a shared outdoor amenity space featuring a complex design of changing hardscapes.  Home to a theater, bar area, grilling stations, bocce court, fire pits, and lounges, the space is integral to the neighborhood feel of the development. Clark also delivered Loft, a five-story office building that features 75,000-square feet of leasable office space atop two-stories of retail. The three-story loft-style office space features 14-foot ceilings, distinct column drops, open stairs, operable windows, and underground parking. Teamwork to Meet Critical Deadlines The massive project’s successful completion required precise coordination of key phases of work to meet the tight schedule, from sitework to turnover. The Whole Foods space was required to be turned over for fit-out a full year before the remainder of the project reached substantial completion. With over 200 risers running through the Whole Foods space to serve utilities for the apartments above, the team worked closely with the structural engineer to determine the final location of these pipes, long before the apartments were completed. In addition, the grocery space was protected from any potential leaks in the apartments by a giant “structural bathtub” that was constructed in a 6,000-square-foot interstitial space. This steel structure was hung from the ceiling and had the capacity to collect up to three feet of water. To complete the turnover of this space, the tower cranes, two of which were located within the grocery store’s footprint, needed to be removed as early as possible. To achieve this, concrete work and setting precast panels proceeded on an aggressive schedule, at times around the clock. Once precast was complete, the cranes were removed and the space where they stood was filled with concrete. The Boro only had one base architect for the entire project, but three separate interior designers, a landscape architect, and an interior designer all coordinated designs in the shared outdoor space. Careful coordination and attention to detail ensured the designs came together beautifully. Awards 2020 Best of NAIOP Northern Virginia Award (Multi-Family/Residential) 2020 ABC of Metro Washington Excellence in Construction Award (Mixed-Use)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data